NORTHBOUND PHILIPPINES NEWS ONLINE

PRRD at the inauguration of the Palm Concepcion Power Plant

President Rodrigo Duterte leads the ceremonial switch-on of the 135-megawatt Circulating Fluidized Bed Combustion Power Plant of the Palm Concepcion Power Corporation (PCPC) during the inauguration in Malacañang on Monday (Nov. 28, 2016). Joining the President in the ceremony are Energy Secretary Alfonso Cusi, PCPC Chairman Dr. Walter Brown, PCPC President Roel Castro and PCPC Director Jacinto Ng. (Photo by Ace Morandante/PPD/PNA)
President Rodrigo Duterte leads the ceremonial switch-on of the 135-megawatt Circulating Fluidized Bed Combustion Power Plant of the Palm Concepcion Power Corporation (PCPC) during the inauguration in Malacañang on Monday (Nov. 28, 2016). Joining the President in the ceremony are Energy Secretary Alfonso Cusi, PCPC Chairman Dr. Walter Brown, PCPC President Roel Castro and PCPC Director Jacinto Ng. ACE MORANDANTE/PPD/PNA-northboundasia.com
Exit mobile version